Unfortunately, Internet Explorer is an outdated browser and we do not currently support its use with our website. To have the best browsing experience, please upgrade to Microsoft Edge, Google Chrome, Firefox or Safari.
Upgrade browserRegent Projects were commissioned to carry out refurbishment works of the hospitality box at Saracens Rugby Stadium.
The project required stripping out the existing carpet covering, existing wardrobe cupboard, ceiling bulkhead oak panels, rear wall oak panels and make good walls and ceiling while installing a new ceiling hatch.
Electrical work carried out in this project included Isolating electrics above existing work surface, remove existing tv, plug sockets and casings. We also supplied and fit matt black power & spur point casings, lighting spur points and electrical sockets. We relocated the power and data, heating controls, intercom waiter service call point and recess lighting controls. New data and double power sockets installed for tv adjacent bar.
We fit new LVT in plank formation, painted kitchen cabinet doors plus main door and frame and decorated walls and ceilings throughout.
The finishing touches were applied with a new mirror splash back, wood panelling and new lighting roses.
All furniture and flooring was supplied directly by client.
If you have an upcoming office fit out, refurbishment or home renovation project you would like to discuss with an experienced commercial & residential construction company please contact us on 08007747144 or submit a call back request via the form below